8 |
PROLINE
ranGe HooDs
preparation
inspect range hood
1. Check contents of box:
♦ chimney
♦ ceiling bracket
♦ range hood
♦ flexible duct
♦ small bag of hardware
2. Test
♦ plug in and test controls, lights, fan
♦ inspect for any damage during shipping
♦ you must report any damage to Proline within 7 days for a refund
tools you’ll need
♦ power drill
♦ screwdrivers
♦ drill bit
♦ tape measurer
♦ marking pencils
♦ duct tape aluminum backed
♦ level
♦ wall anchors (Make to buy the right kind. Hardware stores can help)
prepare ductwork
Ductwork should already be punched through celling (or the wall if ceiling is not
an option) and ready to hook up to the range hood before beginning installa-
tion. See venting requirements on page 7 of this user manual.
If you are not venting to the outside of your home, be sure to install your
charcoal filters before mounting the hood to the wall. See information on char-
coal filters on page 5 of this manual.