Smeg SBQ36X Ventilation Hood User Manual


 
EN
6
6
INSTALLATION
Wall drilling and bracket fixing for Optional Chimney Telescopic
1200 mm
11a
406
7.2.1
11
12a
313,5
7.2.1
X
313,5
1÷ 2
833 - 1138
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
center of the area in which the hood will be installed.
Draw a horizontal line at 1200mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit (see
the picture).
Mark the wall at the centers of the holes in the bracket.
Place bracket 7.2.1 on the wall as shown at X” below the first bracket (X = height of the up-
per chimney section supplied).
Mark the wall at the centers of the holes in the bracket.
Drill ø 8mm holes at all the center points marked.
Insert the wall plugs 11 in the holes.
Mark a reference point as indicated at (833 mm for 36” model or 1138 mm for 48” model)
from the vertical reference line and 406 mm above the horizontal reference line.
Repeat this operation on the other side.
Drill ø 12 mm holes at all the center points marked.
Insert the wall plugs 11a in the holes and screw into place.
Fix the brackets using the 12a screws supplied.