Thermador VCI 230/236/248 DS Ventilation Hood User Manual


 
PAGE 5
BEFORE INSTALLATION
Step 1: PREPARING THE CUTOUT
The wall must be flat and vertical.
Make sure that the wall is capable of providing a firm
hold for mounting screws and plugs.
Weight in kg: 24,5.
Preparing the wooden framework
Step 2: PREPARING THE INSTALLATION
There are two mounting methods:
Installation in wooden framework or
Installation with the mounting brackets provided.
Remove mounting brackets by removing screws
–After removing the mounting brackets, the screws must
be inserted again.
Preparing the installation with mounting
brackets
4 x 1/4" holes