FITTING INTO THE CABINET
IMPORTANT: Ensure that the oven is switched
off at the wall before any further work is carried
out.
Using a tape measure establish the internal width
of the cabinet. Refer to page 8 if greater than
565mm.
Position the cooker in front of the cabinet. See
Fig. 9.
Take out all oven furniture before installation to
reduce the weight you need to lift. The oven door
should be taped up to keep it closed whilst lifting.
To place the cooker into the cabinetry follow the
procedure below:-
N.B. Two people will be required to carry out the
lifting procedure.
a) Each person should squat either side of the
cooker.
b) Tilt the cooker so that your hands can support
the underside of the cooker.
c) Keeping your back straight, raise the appliance to
the cabinet by straightening at the knees.
d) Rest the rear underside of the cooker on the
cabinet floor while your hands support the front.
e) The cooker can be pushed fully into the cabinet.
Take care to avoid fouling the mains lead.
f) Ensure the cooker is central in the cabinet and
level.
g) When the cooker is fully housed, screw the
stability screws (supplied with the cooker) into
the side of the cabinet taking care not to distort
the side trims (see Fig.10). It is advisable to turn
each screw alternately to avoid damaging the
trims.
h) Switch on the cooker then refer to the operating
instructions in the following pages.
13
Mains
Cable
Pack Base
Fig. 9
Fixing Points
for
Stability Screws
Fig. 10