Tricity Bendix BS 613/2 Oven User Manual


 
HOW TO FINISH UNPACKING
Place packed cooker next to the cabinet in which
it will be installed.
Remove the cooker packing except for bottom
tray which should be left in position until the
cooker is ready to be fitted into its cabinet.
Ensure the owner is given these operating
instructions.
TOOLS REQUIRED
The following tools will be needed and it helps to
assemble them before starting to install the oven:-
A terminal screwdriver (3mm wide blade)
A pozidrive screwdriver
Pliers
Wirestrippers
Knife
Sidecutters
Adhesive Tape
Tape Measure
PREPARING CABLE
We recommend you use a new length of cable to
ensure your safety.
Ensure you have the correct length of cable
appropriate to the wiring method you are using.
When fitting new cable allow sufficient cable for
removal of the unit at a later date, should it be
necessary.
Score, but do not cut through, around the
sheathing with a knife 100mm (4in) from
each end of the cable and break through
to the encased wires by bending the cable
backwards and forwards to fatigue the
sheathing.
Carefully score down from each end of the cable
sheathing along the length of the bare earth wire
(if a cut was made along the length of the live
and neutral wires, it might cut into their heathin to
the cuts already made.
Carefully prise open the sheathing at each end of
the cable to expose the encased wiring.
TO REMOVE COVER OF MAINS TERMINAL
From the rear of the cooker, remove mains input
terminal cover to gain access to terminal block.
First remove retaining screw with pozidrive
screwdriver. See Fig. 5.
Prise cover loose using screwdriver in position
(1) then lever off with screwdriver in position (2)
at either side. See Fig. 6.
11
MAKING THE ELECTRICAL CONNECTIONS
Important: Switch off at mains, miniature circuit
breaker and, if appropriate, remove fuse before
commencing any electrical work
and neutral wires, it might cut into their sheathing) to
Fig.5
Fig.6
Pozidrive
Screwdriver
Terminal
Screwdriver
(2)
(1)