............ www.truemfg.com ............
INSTALLATION / OPERATION INSTRUCTIONS
True Food Service Equipment, Inc.
5
5
Step 2
A. Remove skid by using a phillips head screw-
driver and an adjustable wrench.
B. For easy removal from the skid, unscrew and
remove grill from the back of the cooler.
C. Remove the four brackets from the base of the
cooler.
D. Carefully move the cooler off the back of the
skid. Tilt the cooler backwards just enough to
remove the skid from under the cooler.
E. Free plug and cord from inside the lower rear of
the cooler (do not plug in).
F. Place grill back onto rear of the cooler.
G. The merchandiser should be placed close
enough to the electrical supply so that exten-
sion cords are never used.
WARNING:
Compressor warranties are void if the
unit is more than 9ft. (2.7 m) from
plug-in connection.
LOCATING
Step 3
A. Set unit in its final location. Be sure there is
adequate ventilation in your room. Under extreme
heat conditions, (100 F+, 38 C+), you may want to
install and exhaust fan.
WARNING:
Warranty is void if ventilation is insufficient.
B. Proper leveling of your True cooler is critical to
operating success. Effective condensate removal
and door operation will be effected by leveling.
(See image 2)
C. When the cooler is in its final position adjust
the castors as needed to level the unit. The unit
should be leveled front to back and side to side
with a level. To insure proper ventilation for
the compressor, keep the cabinet 1” (2.54 cm)
from rear wall. 1” (2.54 cm) rubber bumpers are
attached to the back of some cabinets.
LEVELING CASTORS
Four sets of shims have been provided in warranty
packet for leveling castored units positioned on
uneven floors. Shims must be positioned between
cabinet and castor mounting plate. (See image 3)
If the cabinet is not level prop up one end of
the cabinet between castors with a 6” block.
(See image 4)
Note:
Do not push block more than 5”
under cabinet.
Loosen castor bolts with an adjustable wrench
enough to slide shims between the castor mount-
ing plate and cabinet bottom.
F°
35
°
®
Image 1
LEVELING
Important Safeguard for installation of leg/castor (Images 1-5 demonstrate procedure)