Victory Refrigeration VBC-480 Refrigerator User Manual


 
Proper installation is the first step to operation. We recommend that your refrigerator or
freezer be installed by an authorized Victory Certified Installer.
RECEIVING SHIPMENT
All units are performance tested and thoroughly inspected prior to shipment. Upon leaving the factory,
all units are in perfect condition. Upon receipt, examine the exterior of the shipment packaging for any
signs of rough handling. If the cabinet is damaged, it should be noted on the delivery slip or bill of
lading and signed. A claim must be filed immediately against the carrier indicating the extent and
estimated cost of damage incurred.
UNPACKING
Remove all external and interior packing and accessories. Ensure all packaging is disposed of
safely.
INSTALLATION
The cabinet should stand level to ensure correct operation of self closing doors and proper drainage
of condensate from the evaporator.
Models fitted with casters are non-adjustable, therefore a level platform/floor should be provided where
the cabinet is to be located. On models fitted with adjustable legs leveling may be achieved by
adjustment of the bottom section of the legs. For marine specification models with flanged feet for
deck fixing and bulkhead fixings, installation should be carried out by a specialist marine company.
For top mounted refrigeration systems please ensure there is 20” [500mm] between the top of the
cabinet and ceiling for service technician access and ventilation.
If the cabinet has been laid on its back or tipped, DO
NOT
switch on immediately. Leave the cabinet
in the upright position for at least 12 hours before switching on.
ELECTRICAL SUPPLY
Wiring should be done by a qualified electrician in accordance with local electrical codes. All models,
with the exception of the VBC-100 and all Roll-In VBC’s, come fitted with a NEMA plug for safety and
must be grounded. We recommend that if the plug or cable fail, contact Victory’s parts department for
a replacement part.
The VBC-100 and Roll-In VBC’s are 3-phase and requires connection to a suitable supply.
START-UP
MAIN CONTROL BREAKERS
Should the equipment fail to run on initial connection, please check that all Main Control Breakers
(MCBs) are in the "ON" position at the back of cabinet. (*Note: The "ON" position is confirmed by
red indicators on the MCBs.)
INITIAL START-UP ERROR CODES & CHECKS
An “a7” error code (indicating a loss of power) with an audible alarm sound off will always occur
during an initial start-up of a blast chill cabinet. Press the "CANCEL" button (red with
symbol), the
error code and audible alarm will discontinue.
A “Battery Failure Configuration Suspect” error message ticket will always print during an initial
start-up. Do not be alarmed when the error message prints; it is only indicating that the back-up
batteries that hold the cabinets data during a power failure is not fully charged. Full battery charge
should be within 24 hours after start-up.
Check the time and date on the printed tickets. If the ticket has printed an incorrect time and date or
the printer logger paper is not feeding properly, see page 7 for further instruction.
2