Vulcan-Hart K20ETL Hot Beverage Maker User Manual


 
— 6 —
ELECTRIC STATIONARY KETTLES
MINIMUM CLEARANCE
REQUIREMENTS AND RECOMMENDED
FLOOR DRAIN LOCATIONS
No side and back clearance required, except
for operation and service requirements.
Fig 3. Floor Drain Location
INSTALLATION PROCEDURE
Level the kettle by making necessary
adjustments using the flanged feet.
1. Place a spirit level on the rim of the kettle
with the cover open. Adjust the feet to level
the kettle left-to-right and front-to-back.
2. Mark anchoring hole locations through the
flanged feet.
3. With hole location marked, drill holes to
accommodate 5/16" studs.
4. Reposition the kettle.
5. Bolt the kettle down and apply an NSF
approved silicone sealant around the
bolt heads and flange making contact
with floor surface. Wipe off excess
sealant immediately.