Vulcan-Hart VB90 ML-126548 Food Warmer User Manual


 
V SERIES FOOD HOLDING, TRANSPORT, & BANQUET CARTS F-41140 (09-09)
3
GENERAL
INTRODUCTION
Vulcan-Hart Holding & Transport
Cabinets and Banquet Carts are
produced with quality workmanship and
material. Proper installation, usage, and
maintenance of your cabinet will result
in many years of satisfactory
performance.
It is suggested that you thoroughly read
this entire manual and carefully follow all
of the instructions provided.
The V Series Holding & Transport
Cabinets and Banquet Carts provide an
efficient means of transporting and
holding bulk prepared foods at proper
serving temperatures.
INSTALLATION
Before installing, verify that the electrical
service agrees with the specifications on
the rating plate located on the lower
back corner of the cabinet. If the supply
and equipment requirements do not
agree, do not proceed with unpacking
and installation. Contact your Vulcan-
Hart Customer Service Department
immediately.
The Cabinet was inspected before
leaving the factory. The transportation
company assumes full responsibility for
safe delivery upon acceptance of the
shipment. Immediately after unpacking,
check for possible shipping damage to
the cabinet.
UNPACKING:
If the cabinet is found to be damaged,
save the packaging material and
contact the carrier within 15 days of
delivery.
Carefully unpack and place in a work
accessible area as near the installation
position as possible.
1. Open the door and carefully
remove any packaging materials
and the retaining straps that hold
the wire plate racks (Banquet
Carts) or the tray slides and tray
slide upright side supports
(Holding & Transport Cabinets).
2. Peel off vinyl protection film.
3. On Banquet Carts, lift the plate
racks into position on the side
brackets.
4. On Holding & Transport
Cabinets, remove cardboard
element cover protector from
cabinet bottom.
Remove adjustable tray slides
from box.
Remove the tray slide supports
and install them in the cabinet.
a. Hook the openings in the
flat flange of the support
over two vertical carriage
bolts on the interior of the
cabinet.
b. Make sure all flanges on
the four supports face the
door opening.
Install tray slides in the cabinet.
Make sure the hook on the end of
the tray slide is up.