Weber 450 Griddle User Manual


 
4
a)
b)
INSTALL “U” RAILS
Figure 1
U rail
support
mounts
Tabs
Frame rails
U rail
supports
Note: lock the casters before starting assembly.
You will need: two U rails, eight 1/4-20 x 1/2 inch bolts,
eight nylon washers, and a 7/16 inch or adjustable wrench.
Insert the tabs of the U rail into the frame rails. Make sure
both tabs are inside the frame rails. Figure 1(a) and that the
U rail supports are outside of the U rail support mounts.
Figure 1(a).
Push the U rail down into place on top of the frame rail.
Add a nylon washer to a bolt and start the bolt through the
a)
b)
Figure 1
U rail
support
mounts
Tabs
Frame rails
U rail
supports
Summit 450
Summit 650
hole of the frame rail into the tab of the U rail. Only start the
two bolts. Figure 1(b).
Align the holes of the U rail support with the holes in the
U rail support mount. Add a washer to a bolt and start the
bolt through the U rail support and into the U rail support
mount. Figure 1(b). Only start the two bolts.
Once you have started the four bolts per side, use the
7/16 inch or adjustable wrench to tighten the four bolts on
each side of the barbecue.