Whirlpool UXT4030AY Ventilation Hood User Manual


 
6
INSTALLATION INSTRUCTIONS
Prepare Location
NOTE: Before making cutouts, make sure there is proper
clearance within the ceiling or wall.
1. Disconnect power.
2. Select a flat surface for assembling the range hood. Place
covering over that surface.
3. Lift the range hood and set it upside down onto covered
surface.
4. If cabinet has recessed bottom, add wood filler strips on each
side. Install screws to attach filler strips in locations shown.
Determine Wiring Hole Location
Cut only one 1¹⁄₄" (3.2 cm) diameter wiring access hole.
1. Determine and clearly mark a vertical centerline on the wall
and cabinet in the area the vent opening will be made.
To wire through top:
1. Mark a line distance “A” from the right of the centerline on the
underside of the cabinet. Mark the point on this line that is
⁷⁄₈" (2.2 cm) from back wall. Drill a 1¼" (3.2 cm) diameter hole
through the cabinet at this point.
To wire through wall:
1. Mark a line distance “A” from the right of the centerline on the
underside of the wall. Mark the point on this line that
is ⁷⁄₈" (2.2 cm) from the underside of the cabinet. Drill a
1¹⁄₄" (3.2 cm) diameter hole through the rear wall at this point.
A. Centerline
Cabinet
bottom
Wall
3" (7.6 cm)
Wood filler strips
(recessed cabinet
bottoms only)
3" (7.6 cm)
A
A. 8³⁄₈" (21.3 cm) for 30" (76.2 cm) models
11³⁄₈" (28.9 cm) for 36" (91.4 cm) models
A. 8³⁄₈" (21.3 cm) for 30" (76.2 cm) models
11³⁄₈" (28.9 cm) for 36" (91.4 cm) models
Centerline
⁷⁄₈" (2.2 cm)
from wall,
not cabinet
frame
A
A
Centerline
⁷⁄₈" (2.2 cm)