Zanussi ZGF782C Range User Manual


 
9
Installation
IMPORTANT:
This hob must be installed by
qualified personnel to the relevant British
Standards.
Any gas installation must be carried out by a
registered CORGI installer.
The manufacturer will not accept liability, should
the above instructions or any of the other safety
instructions incorporated in this book be ignored.
WHEN THE HOB IS FIRST INSTALLED
Once the hob has been installed, it is important to
remove any protective materials, which were put
on in the factory.
On the end of the shaft, which includes the G 1/2"
threaded elbow, adjustment is fixed so that the washer
is fitted between the components as shown in the
diagram. Screw the parts together without using
excessive force.
Gas Connection
Connection to the gas supply should be with either rigid
or semi-rigid pipe, i.e. steel or copper.
The connection should be suitable for connecting to R
1/2" (1/2 BSP male thread).
When the final connection has been made, it is essential
that a thorough leak test is carried out on the hob and
installation. Ensure that the main connection pipe does
not exert any strain on the hob.
A) End of shaft with nut
B) Washer
C) Elbow
It is important to install the elbow correctly, with
the shoulder on the end of the thread, fitted to the
hob connecting pipe.
Failure to ensure the correct assembly will cause
leakage of gas.
FO 0814
FO 0264
Cut Out Size
The dimensions of the cut-out are given in the diagram.
Rectangular cut-out size for hob
560
150 min
480
FO 2038
Dimensions are given in mm.