Zephyr AK8200AS Ventilation Hood User Manual


 
10
www.zephyronline.com
Installation – Installing the Power Pack
1. Install blower into Power Pack
AK8200AS - Blower is pre-installed
AK8300ASX - Refer to page 11 for instructions
Remove support screw from top of Power Pack
before installing into cabinet. FIG 2b
2. Install 8” round adapter to top of Power Pack. See page 11, step 3
for instuctions.
3. Install optional AK08xxAS Stainless Steel Liner. Review manual
included with liner for more details.
4. If no liner is used cut out an opening in the bottom of the cabinet by
following the dimensions in FIG 1.
5. Lift Power Pack into opening and secure to bottom of cabinet using
(4) M4 stainless steel screws, (1) in each corner; see FIG 2.
note: Wood blocking may need to be added to cabinet base if
additional support is needed.
6. Install duct work and seal with duct tape.
7. Install electrical.
8. Remove all packing materials before using Power Pack.
Switch power on and check for leaks around duct tape.
9. Install baffl e fi lters
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
Front View
Ductwork
minimum
3/4” wood base
elec.
metal or other non
combustible material
(4) M4 ss wood screws
(1) in each corner
F
ront
Vi
e
w
D
uctwor
k
m
i
n
i
mum
3/
4” wood base
elec.
cabinet bottom cut-out size
26 1/16” - 34 11/16
AK8200AS AK8300ASX
14 3/4
FIG 1
FIG 2
FIG 2b
remove support screw
C/L
C/L