Zephyr AK8300ASX Ventilation Hood User Manual


 
12
www.zephyronline.com
Installation – Remote Blower Preparation
1. Place 8” round adapter on top of power pack
and secure with (4) M4x8 screws. Connect 8”
round duct work to 8” round adapter.
2. Install threaded end of remote blower wiring
through external blower wiring knock out (B)
located in junction box on top of power pack.
3. Place cap over threaded end of remote blower
wiring and secure by turning clockwise.
4. Connect 6 pin male connector from blower
wiring to 6 pin female connector in the power
pack. (plug is located inside the power pack
protruding from the white control board box).
NOTE: For instructions on installing remote blowers, please refer to the CBE-1000 or PBN-1000A
manuals included in the blower packaging and on our website: www.zephyronline.com
CBE-1000 / PBN-1000A: WIRING DIAGRAM
White (common)
Black (high)
Blue (med)
Red (low)
Green (ground)
Remote Blower
Wiring Box
(hood)
Junction Box
(Remote Blower)
B
B
A
A: Ground wire screw
location (inside)
5. Secure green ground wire from remote
blower wiring to ground screw located
inside the power pack