Zephyr ZGE-E36AS Ventilation Hood User Manual


 
9
7
3/4
7”
9-
7/8”
19-7/8”
C/L
1
-
9/16”
Installation – Preparing the Cabinet
Fig.1
front edge
glass handle
Fig.2
1. Determine and mark center line on wall and cabinet bottom with a pencil.
2. If the cabinet bottom is recessed, wood blocking must be installed to ensure proper
alignment of the hood with the cabinet bottom. Wood blocking should be fl ush
within cabinet bottom.
3. Follow the dimensions in Fig.1 and cut-out the bottom of your cabinet to create an opening
for the hood to fi t through. If you have a frameless cabinet begin the 1-9/16” measurement
(referenced in Fig.1) from front of the cabinet door. This way the front edge of the hood will
be fl ush with the cabinet doors when closed, see Fig.2.