
15NetworkAIR FM DX 60 Hz Operation, Maintenance, and Troubleshooting
Final Inspection Checklist
\
Owner Acceptance
To ensure proper unit operation and trouble free operation the following procedures must be completed
and filed with the customer for future reference.
• Review installation of the equipment. Verify that installation is in compliance with Installation
manual instructions/recommendations.
• Complete start-up checklist and file with owner and factory to activate warranty policy.
• Train personnel responsible for maintenance and minor adjustments to temperature & humidity
set points.
• Recommend spare parts for the owner to keep on hand, especially for critical operation
installations.
• Offer a list of contacts for service, technical assistance, replacement parts.
Ensure that:
The system interior and exterior are clean and free from debris.
Installed options (smoke detectors, firestat, water detector, remote sensor, remote relay shutdown, dry
contact alarm, essential/non-essential lockout, Redundant Unit Group control, condensate pump, etc.)
are operating correctly.
Setpoints and deadbands are set.
Packaging materials are disposed of properly.
You have sent the start-up form to APC.