A SERVICE OF

logo

put on left swing arm,
large washer, bushing cap,
small washers,
nut and snap cap
main frame
assembly
left
swing arm
vertical
column
connecting
arm
wires
right
arm
7
STEP 4 – Swing Arm Assembly
a) Remove the Nut and two Washers from the Left
Arm of the Vertical Column. Slide the Left Swing
Arm with the wire to the inside, onto the Left Arm
of the Vertical Column. Slide the large washer on
then screw the Bushing Cap on with the open
end facing out. Replace the small Washer and
Nut and tighten.
b) Place the Snap Cap over the end of the Bushing
Cap and “snap” it in place.
c) Remove the Allen Bolt, Washer and Nylon Nut from
the bottom of the Swing Arm. Place the
Connecting Arm into the “U” at the bottom of the
Swing Arm. Replace the Allen Bolt, Washer and
Nylon Nut you just removed. Tighten with the
Wrench provided. NOTE: The Nylon Nut and
Washer will be on the inside of the Swing Arm.
As you tighten, the Allen Bolt will nest into the
hole in the “U” bracket.
d) Remove the four Phillips Screws (2 on
each side) from the Connecting Arm.
Place the Swing Arm Cover over the
end and “snap” it in place. Replace
the Phillips Screws using the
Screwdriver provided.
e) Repeat on right side.
left side of unit shown
4d
4c
swing
arm
cover
nylon nut and washer go
on inside of swing arm, as
you tighten,the allen bolt
will nest into “U” bracket.
4b
snap
cap
bushing
cap
small washer
large washer
nut
4a
STEP 3 – Vertical Column Assembly
a) Remove the two Allen Bolts, Washers and Phillips Screw from the
Vertical Column.
b) Slip the Vertical Column Cover onto the Vertical Column as shown.
The Vertical Column should lean back towards the Foot Platforms.
c) Remove the wire tie from the wires inside the Main Frame
Assembly where the Vertical Column will go. Attach the three
wires from the Main Frame Assembly to the three wires coming
out the bottom of the Vertical Column.
d) Insert the Vertical Column into the Main Frame Assembly.
Reinsert the Allen Bolts and Washers you removed in (a).
Be careful not to pinch the wires. Gently pull the wires
up from the top of the Handlebar Tube to prevent any
slack in the wires at the base of the Handlebar Tube.
Hand tighten.
e) Secure the Vertical Column in place with the three
Allen Bolts, Washers and Nylon Nuts from the
Fastener Pack. Tighten with the
Wrench provided. Also tighten
the bolts used in step (d).
f) Let the Vertical Column Cover
slip into place. Push it down
gently until it clicks. Secure in
place with the Phillips Screw
you removed in (a).
M8 x 60mm allen bolts,
M8 washers and M8 nylon nuts
3d
3c
3e
3b
3d
3a