Installation
312787G 7
Install Color Valve Stacks
1. Install the bracket (17) on the fluid station (FS) with
two screws (20). See F
IG. 4.
2. Install the color or catalyst valve stack (VS) to the
bracket (17) with two screws (20).
Connect Valve Air Lines
See FIG. 1. Connect 5/32 in. (4 mm) OD air tubes (11)
from the valve solenoids to the air inlets of each valve.
Refer to the System Pneumatic Diagram, page 14,
and the label inside the color control module.
NOTE: The high pressure color change valves use a
spring-operated exhaust which does not require a sec-
ond air line.
Connect Valve Fluid Lines
1. See FIG. 1. Connect fluid supply lines (FSL) to the
1/4 npt(f) inlet of each valve adapter. Supply solvent
to one valve (SV) at the top of the stack,
2. Connect the hose (19) from the manifold stack fluid
outlet (F) to the flow meter inlet (M). F
IG. 4.
Color Change Board Switch
Settings
Set switches S3-S6 on the color change board(s) as
shown in Table 2 and F
IG. 5, depending on the number
of color change boards and color change modules being
used in your system.
Accessory Dump Valve Kit
15V821 Dump Valve Kit, for Wall Panel Systems
15V822 Dump Valve Kit, for RoboMix Systems
Accessory Dump Valve Kits are available. The kits
include one dump valve, one solenoid, all necessary
parts for installation, and instruction manual 312786.
Order one kit for each dump valve desired.
F
IG. 4: Install Valve Stacks
TI12829a
17
20
FS
VS
20
FM
NOTICE
Verify that all unused fluid ports on the color change
valve stack are plugged before operation. An open
port will leak fluid.
NOTICE
A check valve is recommended on all dead head
valves to prevent color crossover if two valves are
open at the same time.