A SERVICE OF

logo

25
(6)BE
Hardware Needed:
(6)
BF
(4)
BB
4.4.26WDUWLQJDWWKHERWWRPKROHVHFXUHWKH6LGH3DQHOWRWKH)URQW3DQHOXVLQJWKUHH
3/8”-16 x 3 3/4” Hex Bolts (BE)WKUHH3/8” Flat Washers (BD)DQGWKUHH
3/8”-16 Nylock Nuts (BF).
4.4.36WDUWLQJDWWKHERWWRPKROHVHFXUHWKH6LGH3DQHOWRWKH6LGH&HQWHU6XSSRUW
%UDFNHWVXVLQJWZR3/8”-16 x 2 1/2” Hex Bolts (BB)DQGWZR3/8”-16 Nylock
Nuts (BF).
4.4.4 Repeat steps 4.4.1 - 4.4.3IRUWKHRWKHU6LGH3DQHO
Rubber Mallet
BF (4)
´6RFNHW:UHQFK
Hardware Bag: 1018013
Hardware Bag: 1018015
(6)BD
Hardware Bag: 1022647
´:UHQFK
Note: If necessary, after aligning the holes gently tap the Bolts with a Rubber Mallet
or Hammer to help pass them through the holes.
DO NOT
COMPLETELY
TIGHTEN THE
NYLOCK NUTS YET.
BF
BE
BF
BB
BD