C. Conveyor
Belt Replacement:
1.
Remove
the right
and left
side
covers
by removing
the
6 screws
on
each
side. On
right
side of toaster
use
a
screwdriverto
push
the
bearing
as
shown.
With
the hole in
the bearing
lined
up witn
tne slot
in the retaining
plate,
push
the
conveyor
shaft
thru
the slot.
See Figure
g.
2. To remove
all tbnsion
on
the
conveyor
bett
push
the
conveyor
shaft
as far
as
possible
toward
the
right
side
until
the
left end of
conveyor
shaft
is free
of
the
left side
bearing.
see Figure
9.
3. Tum
the
conveyor
belt
so
the
master
links
are
at
the front
of
the toaster.
See Figure
g.
4.
Using
long nose
pliers
remove
the three
master
links. Replace
the
belt
or
replace
the damaged
links
in
the belt.
5. Reassemble
the master
links
into
the
conveyor
belt.
6.
Pushthe
leftside
bearing
with
ascrewdriverasshown
in
Figure
g
and reinsertthe
shaft
intothe
bearing.
Flelease
the
shaft
from the
right
side
support
slot
and center
the shaft
between
the side walls.
Figure
9
t)