A SERVICE OF

logo

2. Insert (at any position) 2 channel tie-down
hooks
A
into the channel opening
B
of
each channel and slide to the desired posi-
tion.
3. Hand tighten each hook until it is securely
fixed to the channel.
4. Toreposition the channel tie-downhook un-
screw the hook loop from the hook plate (2
revolutions), move to a new location, and
retighten.
A
Correct,
B
Incorrect
LTI0145
LTI0146 LTI0147
Technical and consumer information 9-17