
3-1SV61503 Rev. A
Section 3
Running Mail
Checklist Before Running Mail
Before you run mail on your digital postage meter, review these
items:
• Make sure your postage meter is plugged into a properly ground-
ed, 110 VAC receptacle. Always follow the safety precautions
listed in Section 1- Introduction.
• Check that you have enough postage for your mail run. Press
Funds to view your current balance.
• Check that you have a spare
ink cartridge if you are low on ink
and need to run a large number of mail pieces. See Section 11
- Supplies and Options for ordering additional ink cartridges.
• If you plan
to apply postage on large or thick pieces and parcels
that can't be run through the machine, use the optional tape
sheets. See Section 11 - Supplies and Options for part numbers
of tape sheets. Insert the tape sheets in the machine just like a
normal mail piece. Apply the tape sheet on the mail piece or par-
cel in the upper right-hand corner.
• When you power up your postage meter, the main screen ap-
pears on the display. If your postage meter has been set up to
require a lock code or password, you are prompted to enter it.
A typical main screen is show below (with optional scale con-
nected):
$0.50 0 g
Dom Ltr Std 06/16