A SERVICE OF

logo

Regency
®
L676 Direct Vent Gas Fireplace 37
INSTALLATION
6) Spread all of the Embers on the bottom brick panel around the burner
tube and inbetween the front burner tube and the grate as shown.
03-25
03-27
03-26
03-28
Complete Log Set Installation
7) Spread the vermiculite on the base brick panel covering the remaining
exposed base brick.
Embers on bottom brick panel.
Embers in between front burner tube and grate.
INSTALLATION