Atdec VFS-DV Double Oven User Manual


 
TIGHTEN (+kg)
Cable
Balls (x2)
Cable
Clips (x2)
LOOSEN (-kg)
Installation Complete
C
No portion of this document or any artwork contained herein should be reproduced in anyway without the express written consent Atdec Pty Ltd.
Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published 12.10.11
Step 5. Attach your Display to the Quickshift Donut
HOOK
Back of Display
Quickshift Mount.
Hook the top of the VESA plate onto the
Press and hold the Release Buttons. Gently
push bottom of VESA Plate into Quickshift
Mount. Release Buttons to lock in place.
Release Button
Phillips-head
Screwdriver
Security Screw
CLOSE
OPEN
Slide the Quickshift Donut to
desired position.
Connect cables to your Displays, routing
them down to the rear of the poles.
Push the cables into the slots, using either
the Cable Balls or Cable Clips to secure
them to the pole as shown.
Note: Ensure enough slack is left in cables
to allow for movement. When the slot in
each pole cannot be used, use the supplied
Cable Clips to secure the cables.
OR
LOOSEN
Close the lever to lock the
Quickshift Donut in place.
Step 6. Adjust the Height of the Quickshift Donut
Step 7. Adjust the VESA Ball Mount
(Optional) Insert the Security Screw,
and tighten using a Phillips-head Screwdriver.
If necessary, adjust the tension
between the Donut and the Pole
using the 5mm Allen Key supplied.
Open the lever to loosen the
Quickshift Donut.
TIGHTEN
TIGHTEN
PUSH
Step 8. Cable Management
3mm Allen Key
Tension Plate
Position your Display to the desired viewing angle using
the ±20° tilt allowed by the VESA Ball Mount.
To make any adjustments, use the 3mm Allen Key
supplied. Apply half a turn at a time to each screw on the
Tension Plate to adjust evenly.
If the display does not hold its position, or is too resistant,
adjust the Tension Plate located at the rear of the VESA
Ball Mount.
Check the display, and the adjust again if necessary.