OPERATION
Fig. 4 Brewer Operation Diagram
A. START-UP
For initial start-up, or if the brewer has not been used for an
extended period of time:
♦ Be sure spray disk and brew gasket are properly installed in the
brew head.
♦ Be sure the water supply is properly connected and the water
supply valve is turned ON.
♦ Be sure the WATER TANK IS FILLED
BEFORE plugging the brewer into a receptacle, or otherwise
connecting brewer to electrical power THE WATER TANK MUST
BE FILLED. Place an empty decanter under the brew head. Lift
the pour-over cover then pour warm tap water into the pour-over
opening until water flows from the brew head. When water stops
dripping from the brew head, empty the container.
Once the tank is full of water, connect the brewer to electrical
power. For Models 1016 & 1074, press power switch to ON.
The heating elements will begin heating the water in the tank.
When the water has reached the proper temperature, the
“HEAT” LED will go out.
IMPORTANT:
Tank must be full of water
before connecting brewer
to electrical power.
Heating elements will be
damaged if allowed to
operate without being fully
submerged in water.
Damage caused by
operating the brewer
without water in the tank
is NOT COVERED BY
WARRANTY.
6
641 75844 Owners Manual E.B.C. Decanter