Bosch Appliances 119 Dishwasher User Manual


 
14 - ENGLISH
www.boschappliances.com
Figure 23
Figure 22
After installation of the dishwasher, open
and close the door several times to make
sure that it does so with ease. If the door
closes too quickly or if the door falls open,
the spring tension needs to be adjusted.
To Adjust the Spring Tension
Obtain Spring Tension Screws (2) out
of the SHI/SHV parts bag (see Figure
3).
Insert the screws in the right and left
sides and adjust spring tension as shown
(see Figure 22).
Door Tension Adjustment
(only in SHI and SHV models)
FINAL ADJUSTMENTS
Adjust screws
on right and
left sides
Raising the Rear
The rear leveling leg is adjusted by turning
the center screw at the front of the
dishwasher.
Raising the Front
The front leveling legs are adjusted by
rotating the leveling legs on the front left
and right sides of the dishwasher.
Use a screwdriver and tap the end lightly
with a hammer to turn the legs (see
Figure 23).
Leveling the Dishwasher
Note: If additional height is needed:
Shims may be added under the leveler feet.
Torx T 20