- 7 -
2. PREPARE THE INSTALLATION (CONT’D)
Cut-out the openings for duct (A) and power cable (B), in cabinet or wall, according to the direction of discharge chosen.
See figures below.
NOTE: For all internal blower hoods, the cut-out opening for house wiring can be made in cabinet bottom OR wall, no matter
the discharge chosen (vertical or horizontal).
DUCTED INSTALLATIONS ONLY
HORIZONTAL DISCHARGE
VERTICAL DISCHARGE
VERTICAL DISCHARGE ONLY
L
C
CABINET BOTTOM VIEW
22”
10”10”
48” INTERNAL DOUBLE BLOWER HOOD
HD0258A
L
C
B
CABINET BOTTOM VIEW
5¼”5¼”
3¾”
A
INTERNAL SINGLE BLOWER HOOD
L
C
INTERNAL SINGLE BLOWER HOOD
2”
B
3¾”
5¼” 5¼”
A
L
C
22”
48” INTERNAL DOUBLE BLOWER HOOD
5½”
10” 10”
7/8”
5½”
3/4”
L
C
CABINET BOTTOM VIEW
5
7
8”
HOOD WITH IN-LINE OR EXTERIOR BLOWER
3½”
4
7
8”
B
A
Ø 10½”
10¼”
B
A
5
8”
C
C
¼”
2”
2”
B
A
2”
2”
2”
2”
2”
9³
8”
³
8”
CABINET CENTER LINE
HOOD
DIMENSION C
WIDTHS
30’’ 13”
36’’ 16”
42’’ 19”
48’’ 22”
HOOD
DIMENSION C
WIDTHS
30’’ 13”
36’’ 16”
42’’ 19”
48’’ 22”
3. INSTALL BACKSPLASH (OPTIONAL)
Backsplash must be installed before the hood shell because the hood shell covers the backsplash top mounting screws. In order
to be able to install the backsplash, make sure you have at least 18’’ clearance between bottom of hood and range control panel
or cooktop. (See instructions packed with backsplash.)