- 8 -
UPPER
FLUE SECTION
NON-DUCTED
RECIRCULATION
PLENUM
AIR
VENTS
(in upper flue section)
UPPER
BRACKET
LOWER
FLUE SECTION
DUCT
SEAM
DISCHARGE
COLLAR
5" ROUND
METAL DUCT
REDUCTION
MEASURE
!
!
Non-ducted recirculation Configuration
1. Adjust the width of the flue mounting
bracket to equal the inside width of
decorative flue. Insert and tighten
mounting screws to hold bracket width.
2. Use mounting screws and wall anchors to
secure flue mounting bracket to the
ceiling as shown.
3. Turn upper flue section upside down so
air vents are at the top. Slide upper flue
section into lower flue section.
4. Connect the non-ducted recirculation
plenum to the upper flue section with (4)
flat-head screws (supplied).
5. Install the reduction on the discharge collar.
6. Measure the distance from the top of the
reduction to the ceiling. Cut a length of 5"
round metal duct 5" shorter than this
dimension.
7. Fit duct section over the non-ducted
recirculation plenum. For best fit, make sure
duct seam is toward the front.
8. Set duct/flue assembly on hood with top
tilted away from wall. Reach around flue
to engage bottom of duct with discharge
collar on hood. Tilt flue up against wall.
Duct seam can be cut to length if
necessary.
9. Extend the upper flue to the ceiling and
secure with two mounting screws.
FLUE MOUNTING
BRACKET
MOUNTING SCREWS
=
=
FASTEN FLUE TO
UPPER BRACKET
WITH MOUNTING
SCREWS
MOUNTING SCREWS