Broan WC26I Ventilation Hood User Manual


 
- 11 -
PREPARE THE HOOD
NON - DUCTED HOODS ONLY
Note: The following materials must be purchased separately for non-ducted
recirculation installations.
Non - Ducted Recirculation Kit, Model ANKWC26.
5” diameter duct.
1. Remove the tape on the electrical system plate; place the electrical system plate
on the hood (use a protection). Fig.12.
2. Discard discharge collar/damper supplied with the hood. Install the 5” to 6”
adapter supplied with the Non-Ducted Recirculation Kit.
3. Secure the plenum to the flue mounting bracket with (2) 3.9x6mm flat head
screws (the screws are supplied with the Non-Ducted Recirculation Kit
“ANKWC26”). Fig. 13.
3.9x6mm
FLAT HEAD
SCREWS
PLENUM
FLUE MOUNTING
BRACKET
FIG.13FIG.12
ELECTRICAL
SYSTEM
PLATE
PROTECTION
5”-6”
ADAPTER