Bunn 39130.0000J Coffeemaker User Manual


 
Page 6
39130 020608
-1000 213.8 101.0 200 93.3
-500 212.9 100.5 200 93.3
0 212.0 100.0 200 93.3
500 211.1 99.5 200 93.3
1000 210.2 99.0 200 93.3
1500 209.3 98.5 200 93.3
2000 208.4 98.0 200 93.3
2500 207.4 97.4 200 93.3
3000 206.5 96.9 199 92.8
3500 205.6 96.4 198 92.2
4000 204.7 95.9 197 91.7
4500 203.8 95.4 196 91.1
5000 202.9 94.9 195 90.6
5500 201.9 94.4 195 90.6
6000 201.0 93.9 194 90.0
6500 200.1 93.4 193 89.4
7000 199.2 92.9 192 88.9
7500 198.3 92.4 191 88.3
8000 197.4 91.9 190 87.8
8500 196.5 91.4 189 87.2
9000 195.5 90.8 188 86.7
9500 194.6 90.3 187 86.1
10000 193.7 89.8 186 85.6
Brew water temperature is factory set at 200o F (93.3o C)
Areas of high altitude will require lowering this tempera-
ture to prevent boiling. This chart should be used as a
guide when readjusting the brew water temperature.
Altitude
(Feet)
Boiling point
of water
o F o C
Recommended
water temperature
o F o C
1. Flush the water line and securely attach it to the inlet fi tting at the rear of the brewer.
2. Turn on the water supply.
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20
and 90 psi (138 and 620 kPa) from a
1
2" or larger supply line. A shut-off valve should be installed in
the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620
kPa) to reduce it to 50 psi (345 kPa). The water inlet fi tting is
1
4" fl are.
NOTE - Bunn-O-Matic recommends
1
4" copper tubing for installations of less than 25 feet and
3
8"
for more than 25 feet from the
1
2" water supply line. A tight coil of copper tubing in the water line will
facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend the use of
a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this
type of device may restrict water fl ow.
1. Insert an empty funnel into the funnel rails.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source.
4. Turn on the main ON/OFF switch located on the
left side of brewer (If equipped).
5. Water will fl ow into the tank and stop when the tank
is fi lled to its capacity. Display will show "PLEASE
WAIT...TANK FILLING" until tank is fi lled with
water.
6. Wait approximately twenty minutes for the water
in the tank to heat to the proper temperature.
Display will show "READY TO BREW...WATER
TEMP: 200°" when tank is at operating tempera-
ture. Some water will drip from the funnel during
this time; this is due to expansion and should not
occur thereafter.
7. Place a small container beneath the faucet and
open the faucet handle. Release it when you hear
the tank refi lling.
8. Water volumes and fl ow settings have been preset
at the factory. Refer to adjustments for the Set
Brew Volumes section of this manual should the
volume need to be increased or decreased.
9. The brewer is now ready for use in accordance
with the instructions for Coffee Brewing.
10. Repeat steps 5-9 for remaining side on Twins.
INITIAL SET-UP
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backfl ow pre-
vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must
comply with the applicable Plumbing /Sanitation Code for your area.
If setting up new brewer in high mineral
locations, refer to programming (Enable
Brew Logic). Pertains to units with
software version 1.06 & up.