Bunn CWT TWIN Coffeemaker User Manual


 
Page 23
SERVICE (cont.)
10737 120800
Diagrams and check the brewer wiring harness.
5. Check for continuity between the black wire re-
moved from the limit thermostat and the black
insert on the terminal block. with the tank heater
switch in the "ON" upper position. Continuity should
not be present in the "OFF" lower position.
If continuity is present as described, the tank heater
switch is operating properly.
If continuity is not present as described, replace the
tank heater switch.
Removal and Replacement:
1. Shut off and disconnect the incoming water supply
to the brewer.
2. On automatic brewers gently remove the fi ll tube
from back of fi ll basin.
3. Remove the tank inlet fi tting securing fi ll basin the
tank lid. Remove fi ll basin and gasket. Set all three
parts aside for reassembly.
4. On brewers with faucets, disconnect the water
supply to coil assembly and remove the tube from
the tank to the faucet.
5. Remove sprayhead and hex nut securing sprayhead
tube to the hood. Set aside for reassembly.
6. Disconnect the wires on the limit thermostat and
the tank heater and the control thermostat (early
models).
7. Gently pull the thermostat sensor and grommet
from the tank lid.
8. Insert a tube to the bottom of the tank and syphon
ALL of the water out.
9. Gently reinstall the thermostat sensor and grom-
met in the tank lid.
10. Remove the two #8-32 screws securing the tank
assembly to the hood.
11. Lift tank and components out as an assembly and
set aside for reassembly.
12. Disconnect the two black wires from the tank heater
switch.
13. Remove the plastic facenut, hex facenut and the
switch indicator/guard bracket that secures tank
heater switch to the rear of the brewer. Remove
switch and discard.
14. Insert new tank heater switch through the hole
in the upper left rear of the trunk and secure with
switch indicator/guard bracket, hex facenut and
plastic facenut.
15. Reconnect the two black wires the tank heater
switch terminals.
16. Set tank assembly inside the hood on mounting
brackets and secure with two #8-32 screws.
17. Reconnect the wires to the limit thermostat, tank
heater and the control thermostat. Refer to limit
thermostat, tank heater and control thermostat sec-
tions in this manual when reconnecting wires.
18. Brewers with faucet reinstall the faucet tube and
reconnect the water supply tube to the coil as-
sembly.
19. Secure the sprayhead tube to the hood using hex
nut.
20. Install sprayhead.
21. Install fi ll basin, inlet gasket and secure to tank lid
with tank inlet fi tting.
22. Carefully install water fi ll tube into the back of
the fi ll basin.
23. Reconnect and turn on the incoming water sup-
P1135
FIG. 18 TANK HEATER SWITCH TERMINALS
BLK to Limit Thermostat
BLK to Terminal Block
(Black Insert)