Bunn FPG-2 Coffee Grinder User Manual


 
6
Model G9-2
Off/On/Start Switch
OFF - (upper position) Switching to this position stops all operation of the grinder.
ON - (middle position) The switch will return to this position after a grind cycle has begun and will remain
in this position after grinding has ceased.
START - (lower, momentary position) Pressing the switch initiates a timed grind cycle.
Hopper Selector Switch
Left - Switching to this position allows beans to be dispensed from the
left hopper.
Right - Switching to this position allows beans to be dispensed from the
right hopper.
Batch Selector Switch (Optional)
Urn - Switching to this position allows the correct amount of beans to be
dispensed when grinding a large batch.
CARAFE - Switching to this position allows the correct amount of beans
to be dispensed when grinding a small batch.
Dispense Timer
The dispense timer controls the amount of beans that will leave the hopper in a grind cycle. The timer can
be adjusted to dispense a different amount from each hopper. The scale is from 0.4 to 150.0 seconds. Refer to
the Installation & Operating Manuals for Adjustments.
P633
41545 111711
OPERATING CONTROLS
Model G9WD
Grind Pad (a)
Pressing initiates a grind cycle.
Stop Pad (b)
Pressing ends the operation of the grinder.
® Pad (c)
Pressing the copyright pad allows programming access.
Pads (d)
“Hidden” buttons used to navigate setup and programming menus.
Pads (e)
Press button to select small, medium or large batch size.
d
a
b
c
e