Bunn G2 Coffee Grinder User Manual


 
4
ELECTRICAL REQUIREMENTS
The 120 volt and 240 volt grinders have an attached cordset and requires 2-wire, grounded service rated 120
volts ac and 240 volts ac, 15 amp, single phase, 60 Hz. The 230 volt grinders have a power connector and
requires 2-wire, grounded service rated 230 volts ac, 15 amp, single phase, 50 Hz.
INITIAL SET-UP
CAUTION - Unplug the grinder throughout the initial set-up.
1. Open the top lid. Clear all foreign objects and shipping materials from the hopper compartment and the
entrance to the grind chamber.
2. Tip the machine gently, on its back, so it rests with approximately one inch of the bottom overhanging the
work surface.
3. Remove the drawer from the base assembly.
4. Place the base against the grinder bottom and align the four sets of holes.
5. Securely fasten the base to the grinder bottom using the four screws and washers provided.
6. Raise the grinder to the upright position.
7. Insert the drawer into the base assembly.
8. The grinder can now be plugged-in and put into service.
OPERATING CONTROLS
Off/On/Start Switch
OFF - (upper position)
Switching to this position stops the operation of the grinder.
ON - (center, resting position)
The switch will return to this position after a grind cycle has begun and will remain in this position after grinding
has ceased.
START - (lower, momentary position)
Pressing the switch initiates grinding only when a bag is in place behind the chute.
Grind Selector
Allows the user to vary the grind for each bag of coffee. Each setting will provide precisely the same grind every
time it is selected.
Bag Sensor
Prevents the grinder from operating unless the back of a bag is in place behind the dispense chute.
Do not attempt to bypass this safety device.
CLEANING
The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all
surfaces on Bunn-O-Matic equipment. Regular cleaning will keep your grinder looking new for years