Page 5
PLUMBING REQUIREMENTS (Cont.)
Plumbing Hook-Up
Model OL15 has an attached water strainer, proceed to step 2.
Models OL20, OL35, & RL35, proceed as follows:
1. Remove the rear panel and bottom pan. Run the long piece of tubing from the strainer (supplied) under the
brewer and attach it to the water inlet fitting on the bottom bracket. Reinstall the bottom pan and rear panel.
2. Flush the water line and securely attach it to the 1/4" flare fitting on the strainer.
3. Turn on the water supply.
INITIAL SETUP
CAUTION - The brewer must be disconnected from the power source throughout the initial setup, except when
specified in the instructions.
1. Remove the top panel.
2. Rotate the control thermostat knob fully coun-
terclockwise to the "OFF" position and replace the
panel.
3. Insert an empty funnel into the funnel rails.
4. Place a decanter containing a small amount of
water on the warmer beneath the funnel.
5. Connect the brewer to the power source, place
the On/Off brew station warmer switch the upper
position, and momentarily press the start switch.
Water will begin flowing into the tank. When
water stops flowing into the tank, initiate a sec-
ond and a third brew cycle. During this third brew
cycle the tank will fill to its capacity and the ex-
cess will flow from the sprayhead, out of the fun-
nel, and into the decanter.
NOTE - The On/Off brew station warmer switch must
be in the upper position to initiate and complete a brew
cycle.
6. Place the On/Off brew station warmer switch in
the lower position.
7. Disconnect the brewer from the power source.
8. Remove the top panel.
9. Rotate the control thermostat knob fully clock-
wise to the "ON" position and replace the panel.
10. Connect the brewer to the power source and wait
approximately twenty minutes for the water in
the tank to heat to the proper temperature. Some
water will drip from the funnel during this time;
this is due to expansion and should not occur
thereafter.
11. Place an empty decanter under the funnel.
12. Place the On/Off brew station warmer switch in
the upper position and momentarily press the
start switch. Empty the decanter after water has
stopped flowing from the funnel.
13. Allow the water in the tank to reheat to the proper
temperature.
14. Place an empty decanter on the warmer and press
the start switch. Check the water volume in the
decanter after water has stopped flowing from
the funnel. It should be 64 ounces.
15. If not, disconnect the brewer from the power
source and remove the top panel.
16. Add or remove washers to the float on the level
switch as required. Adding washers increases the
volume, removing washers decreases it. Replace
the top panel, connect the brewer to the power
source, start, and measure another brew cycle.
17. Repeat steps 13-16 until 64 oz water volume is
achieved.
P1712
P1478
C
A
U
T
IO
N
DISCARD DECANTER
IF:
.
C
R
A
C
K
E
D
.
S
C
R
A
T
C
H
E
D
.
B
O
I
L
E
D
D
R
Y
.
H
E
A
T
E
D
W
H
E
N
E
M
P
T
Y
.
U
S
E
D
O
N
H
I
G
H
F
L
A
M
E
.
O
R
E
X
P
O
S
E
D
E
L
E
C
T
R
I
C
E
L
E
M
E
N
T
S
FAILURE TO COMPLY RISKS INJURY
P
N
:
6
5
8
1
9
8
5
B
U
N
N
-
O
-
M
A
T
I
C
C
O
R
P
O
R
A
T
I
O
N
FUNNEL CONTENTS
ARE HOT
!