Bunn SNG033000 Coffeemaker User Manual


 
Page 13
MUST GRIND INTO
FUNNEL FIRST
(COFFEE NAME)
SETUP COMPLETE
BEGIN SETUP OF
(COFFEE NAME)
QUIT SETUP?
YES
USE LEFT SIDE
ONLY
INSERT FUNNEL
WITH NEW NAME
REVIEW RECIPES?
NO YES
(COFFEE NAME)
NO YES
3 BATCHES DONE?
NO YES
SET NEW RECIPE?
NO YES
2 SEC.
CYCLES THROUGH
THREE SCREENS
2 SEC.
FUNNEL
CONTAINS NAME
FUNNEL CONTAINS
NO NAME
SETUP BREW VOLUMES, BYPASS,
PULSE BREW, PREINFUSION, DRIPOUT TIME
SEE SEPARATE DIAGRAMS
FOR SETUP INSTRUCTIONS
FUNNEL DETECTED
P2299-1
SET NEW RECIPE
Using a Smart Funnel and a G9-2T DBC or MHG
Grinder:
This function allows operator to set BREW VOL-
UMES, BYPASS PERCENTAGES, PULSE BREW TIMES
and DRIP-OUT TIMES for each coffee name preset in
the grinder's memory.
Certain coffee NAMES are stored in the grinder's
memory. When a particular name of coffee is ground
into the Smart Funnel, that name and the batch size
selected are transferred from the grinder to the
programming chip located in the funnel handle. The
funnel is then inserted into the brewer's left side
funnel rails. The sensor coil on the brewer reads the
information contained in the handle. The name of the
coffee flavor will then appear on the display. This then
allows the operator to set BREW VOLUMES, BYPASS
PERCENTAGES, PULSE BREW TIMES and DRIP-OUT
TIMES for that particular coffee NAME. It also allows
the operator to set other brewing parameters, such
as BREW TEMPERATURE, READY TEMPERATURE,
BREW LOCKOUTS, etc. Each coffee NAME can be set
individually to provide optimum brewing quality.
P2415
BREW OZ. XX.X
(-) DONE (+)
% BYPASS XX.X
(-) DONE (+)
3 BATCHES DONE?
NO YES
PROGRAMMING THE BREWER (cont.)
DUAL
BREWERS
only
Procedure for Setting the Recipe:
NOTE: Before beginning setup, place a server beneath
the brew funnel (left side on DUAL brewers).
1. Insert the funnel into the grinder and select a batch
size to grind. It is not necessary to have coffee
beans in the hopper(s) in order to program the
brewer. The coffee name is pre-selected and stored
in the grinder's memory (for side being ground
on DUAL brewers).
2. Press the GRIND switch. When the grinder stops
grinding, remove the funnel.
3. On the brewer, press and hold the (®) switch until
the display reads UNITS. Release the switch, then
press switch again until display reads SET NEW
RECIPE.
4. Press and release YES. The display should read
INSERT FUNNEL WITH NEW NAME, then USE LEFT
SIDE ONLY on DUAL brewers only, and finally, QUIT
SETUP? These displays will repeatedly cycle.
5. Insert the funnel into the rails of the brewer (left
side on DUAL brewers). The display should read
the NAME of the coffee that was ground into the
funnel, along with a NO and YES. If the NAME on
the display is correct, press YES.
6. If, for some reason, the name of the coffee from
the grinder did not load properly into the funnel,
or if a grind has not yet been done, the display will
read MUST GRIND INTO FUNNEL FIRST. It will be
necessary to grind another batch following steps
1 and 2.
7. If the grind is acknowledged by the brewer, the
display will read BEGIN SETUP OF (COFFEE NAME).
Then the screen will display BREW OZ. and a batch
light will be blinking. (Refer to BREW OZ (SETTING
OR ADJUSTING for description).
41342 080108