Bunn TB3-LP Hot Beverage Maker User Manual


 
Page 10
OPERATING CONTROLS
A. ON/OFF Switch
ON - Placing the switch in the left position allows the start switch to activate a timed brew cycle for three gallons
of tea.
OFF - Placing the switch in the right position stops the brew cycle. Stopping a brew cycle after it has been started
will not stop the flow of water into the funnel until the tank siphons down to its proper level. The switch should
always be placed in this position after a brew cycle and whenever the brewer is unattended.
B. UNSWEET/OFF/SWEET Selector Switch (Models with Sweetener Only)
UNSWEET - Placing the switch in the left positional allows the start switch to activate a timed brew cycle for
three gallons of tea without sweetener.
OFF - Placing the switch in the middle position stops the brew cycle. Stopping a brew cycle after it has been
started will not stop the flow of water into the funnel until the tank siphons down to its proper level. The switch
should always be placed in this position after a brew cycle and whenever the brewer is unattended.
SWEET - Placing the switch in the right position allows the start switch to activate a timed brew cycle for three
gallons of tea with sweetener.
C. LEFT/OFF/RIGHT Selector Switch (TB6/TB6Q Models Only)
LEFT - Placing the switch in the left position allows the start switch to activate a timed brew cycle for three gal-
lons of tea for the left side dispenser.
OFF - Placing the switch in the middle position stops the brew cycle. Stopping a brew cycle after it has been
started will not stop the flow of water into the funnel until the tank siphons down to its proper level. The switch
should always be placed in this position after a brew cycle and whenever the brewer is unattended.
RIGHT - Placing the switch in the right position allows the start switch to activate a timed brew cycle for three
gallons of tea for the right side dispenser.
CAUTION - Make sure the switch, funnel and dispenser are in the correct positions before starting brew cycle.
D. Start Switch
Starts a brew cycle when the ON/OFF switch is in the "ON" position.
TEA BREWING
1. Begin each brew cycle with a clean empty brew funnel and server. (Be sure the server lid doesn’t interfere
with the flow of dilution water.)
2. Insert a BUNN® filter into the funnel.
3. Pour the packet of loose fresh tea leaves into the filter. Approximately three to five ounces is recommended
for three gallons of beverage.
4. Level the bed of tea leaves by gently shaking.
5. Slide the funnel into the funnel rails until it stops. On TB6/TB6Q models, rotate the funnel handle left or right
to align the funnel discharge over the reservoir.
6. Place the ON/OFF switch in the “ON” position. (For brewers with a sweetener, place the UNSWEET/OFF/
SWEET switch in the "SWEET" or "UNSWEET" position)(LEFT or RIGHT on TB6/TB6Q)
7. Momentarily press the START switch.
8. After brew cycle has finished and tea no longer drips from the funnel tip, carefully remove the brew funnel
and discard the used filter.
CAUTION - The funnel contains hot liquids. Remove funnel slowly.
9. Place the ON/OFF (UNSWEET/OFF/SWEET) (LEFT/OFF/RIGHT )switch in the "OFF" position to prevent a false
start.
10. Fresh tea is available at the server faucet.
41465.1 042009