Bunn TWF Coffeemaker User Manual


 
Page 30
SERVICE (cont.)
HALF BATCH SWITCH (Optional)
FIG. 28 HALF BATCH SWITCH
P1959.60
Location:
The HALF BATCH switch is located in the front of
the hood, above and to the far left of the brew funnel.
Test Procedure:
1. Disconnect the brewer from the power source.
2. With an ohmmeter, check for continuity between
the two terminals of the switch.
If continuity is present as described, the switch is
operating properly.
If continuity is not present as described, replace the
switch.
FIG.29 HALF BATCH SWITCH TERMINALS
P1038
Removal and Replacement:
1. Remove the wires from the switch terminals.
2. Compress the clips inside the hood and gently
push the switch through the opening.
3. Push the new switch into the opening and spread
the clips to hold the switch captive in the hood.
4. Refer to FIG. 29 when reconnecting the wires.
GRY to Iced Tea
Brew Timer
PNK to Iced Tea
Brew Timer
10510 081599