Carrier Miracool Refrigerator User Manual


 
2
CONTENTS
Page
GENERAL.........................................................2
UNIT INSPECTION ...........................................2
INSTALLATION.............................................2-5
LOCATE UNIT..............................................2
LEVEL .........................................................4
INSTALL SHELVES .....................................5
CONDENSATE DISPOSAL ..........................5
START-UP.....................................................6-7
PRELIMINARY CHECKS..............................6
INITIAL START-UP.......................................7
REFRIGERATION SYSTEM SERVICE ........8-11
COMPONENTS............................................8
SERVICE AND TROUBLESHOOTING ....8-11
MAINTENANCE.........................................12-13
LAMP REPLACEMENT ..............................12
CONDENSATE REMOVAL.........................12
CONDENSER/EVAPORATOR ...................12
CABINET EXTERIOR.................................12
INTERIOR SURFACE.................................12
GENERAL
These instructions cover the installation,
operation, and maintenance of Carrier Miracool™
series glass door merchandiser units, size 2000L.
UNIT INSPECTION
Examine all packages for damage to packaging
material. Damage to external packaging may have
resulted in unit damage. Check packages for all
accessories and components, including legs,
casters, and shelves. File a claim immediately
with the shipping company if shipment is
damaged or incomplete.
INSTALLATION
LOCATE UNIT
Refer to Figure 1 for unit components. Units are
designed for indoor placement only. Provide at
least 3 inches of space between unit cabinet and
any adjacent wall or fixture.
Remove skid base by removing the retaining
screws (8 hex head bolt screws). Refer to Figure
2 to remove the front grille and gain access to skid
retaining screws. If optional casters will be used,
unit must be located on flat, level surface. Refer to
Table 1 for a list of standard parts.
TABLE 1 – STANDARD PARTS
PART FACTORY
INSTALLED
FIELD INSTALLED QUANTITY
Shelves X 15
Shelf Clips X 60
Instruction Manual - - 1
Leveling Feet X 4
Lamps X 4
Note: Parts shown are for standard units. Quantity of shelves and clips may vary based on factory-supplied options.