Vermont Casting ACSB ACSM Range User Manual


 
9
Addison Electric Stove
30002351
1. Unplug the electrical supply to the unit.
2. Allow the stove to cool if it has been operating.
3. Move the stove away from the wall to gain access to
the rear of the unit.
4. Locate the firebox mounting bracket on the rear of
the firebox. Remove the screws securing the firebox
to the mounting bracket. (Fig. 3)
5. Remove firebox by sliding it rearward out of the cast
-
ing.
6. Gently place firebox on its back on the floor.
7. Locate the glass clips on the inside surface of the
front casting. Remove the glass, and clear the area
of any glass fragments. (Fig. 5)
8. Secure new glass (with gasket) to the inside surface
of the front casting, reversing the process above,
making sure the glass is placed with gasket covering
the bottom and sides of the glass. (Fig. 5)
9. Reinstall firebox into casting, by reversing steps 1
through 6.
Door Glass Replacement Instructions
Fig. 5 Door assembly.
HS107
Addison
glass replace
5/02
Glass
Glass
Clips
Gasket
HS107
Door Glass Replacement Parts
Door Glass w/Gasket 0003442
Clip 1601396
Knob, Therm-Maple 1600660
Control Door Handle Assy 10004442
Shell Enamel Part Numbers - Addison ACSB, ACSM
Color Top Front End, Leg
Right, Left (2 per stove)
Classic 30000624 30000621 30000622 30000623
Ebony 30000790 30000787 30000788 30000789