Cleveland Range 22CGT3 Oven User Manual


 
20
D. Shutdown of the SteamChef after Testing (Continued from Operating Tests) and Front
Burner Cover Installation
1. Turn the SteamChef OFF by turning the ON/OFF lever to the OFF position.
The green Power ON indicator light turns OFF, OR the Keypad turns OFF.
The automatic drain rinse cycle starts.
Wait until the 3-minute drain rinse cycle is complete.
2. When the drain rinse is complete, turn the SteamChef OFF at the Main External Power Switch.
3. Replace the control side panel.
4. When the SteamChef is cool, install the Front Burner Cover and secure it with the provided
screws. See Figure 4-1.
5. Restart and Shut Down the SteamChef.
If the SteamChef starts and shuts down normally with the Front Burner Cover installed, it
is ready for use. Go to Step 6.
If there are any problems: STOP. Shut down the SteamChef and call Cleveland Range at
216-481-4900 or 1-800-338-2204.
6. After completing the Operating Test Procedures and installing the Front Burner Cover, the
SteamChef is ready for use.
7. After the final shut down, leave the cooking compartment door open.