– Secure the hood to the wall using the 4 screws b
(Fig. 18).
– Establish the pipe connection.
– Establish the electrical connection.
– Extract the protective file from the chimney
paneling.
Note: Avoid damaging the sensitive stainless steel
surfaces.
– Fit the top of the chimney into the base. Make
sure that the fastening holes on the side are at the
top.
– Secure the top duct unit with 2 screws on the
ceiling holder.
– Pull the shoe down into its final position
(Fig. 19).
Note: Avoid scratches when fitting the elements
into one another by placing the assembly template,
for example, over the edge of the bottom chimney
paneling to protect it.
– Reinsert the grease filters.
– Place the 3 glass plates on the hood.
5750196934 en 08.01 SK 15
Fig. 18
Fig. 19