17
Installation
MAKING THE ELECTRICAL CONNECTION
Both vent systems require a properly
grounded, 120 VAC, 60 Hz., 15 Amp
electrical service. Maximum full line
load is 8 amps. Always use a
dedicated circuit. Do not use same
circuit that the cooktop is using.
Make all electrical connections
between the vent and blowers, then
connect power to the vent as per the
wiring diagrams. Use wire nuts
provided and electrical tape to secure
all wiring connections at the blowers.
See wiring diagram in Figure 5.
!
WARNINGWARNING
WARNINGWARNING
WARNING
• Ensure that the power supply is disconnected before proceeding.
• Verify that the power supply matches the ratings found on the appliance data
plate before proceeding.
• The complete appliance must be properly grounded at all times when electrical
power is applied.
• Do not ground the appliance with the neutral (white) house supply wire. A
separate ground wire must be utilized.
• If aluminum house supply wiring is used, splice the appliance copper wires to the
aluminum house wiring with special connectors designed and agency-certified
for this purpose. Follow the connector manufacturer’s recommended procedure
carefully. Improper connection can result in a fire hazard.
• Failure to complete electrical connections properly may result in a damaged or
nonfunctional system. Follow the wiring diagrams carefully to ensure a proper
installation.
RVS
GRN
GRN
GRN
GRN
WHT
WHT
WHT
BLK
BLK
BLK
Blower
WHT
BLK
120VAC, 60Hz, 15A
48” (1219mm) power cord with
three prong grounded plug
Wiring of RVS
with B
l
owe
r
Figure 5