Elkay EDFP217FPC Freezer User Manual


 
97565C (Rev. J - 8/07)
EDFP210FP*B EDFP214FP*B EDFP217FP*B
PAGE 3
FIG. 2
FINISHED FLOOR
1. Wall should already be framed for the fountain using dimensions shown in Fig. 1. Shown dimensions pertain to installation location.
These dimensions are required for compliance with ANSI Standard A117.1. and ADA (Framing shown for reference only).
2. Remove bottom cover from fountain and save the screws.
3. Install the fountain using bolts and washers (not provided). Tighten securely.
4. Attach drain tube to fountain and cut to required length using the freeze resistant box as a guide.
5. Install freeze-resistant box - see box instructions.
6. Replace bottom cover.
EDFP210FP/EDFP214FP
ROUGH-IN DRAWINGS