Frigidaire PLHV36W6KC Ventilation Hood User Manual


 
5
InstallationInstallation
InstallationInstallation
Installation
Preparation of mounting surface (Drywall)Preparation of mounting surface (Drywall)
Preparation of mounting surface (Drywall)Preparation of mounting surface (Drywall)
Preparation of mounting surface (Drywall)
1. Select a mounting height comfortable for the user and mark on wall
behind cooktop.
2. Mark center line of cooktop and draw vertical line from bottom of hood
to the ceiling.
3. Tape template, matching center-line and hood bottom as shown in
Figure 2.
4. Mark centers of the 6 fastener locations through template on wall then
remove template.
5. Mark wall with horizontal line 1" above highest and 1" below lowest
fastener location.
6. Find studs behind drywall by
tapping wall or using a stud finder. Mark the center of the studs with a
vertical line to the right and left of the marked fastener location.
NoteNote
NoteNote
Note: 2 x 6's must span at least 2 studs side to side.
7. Cutout drywall along marked lines. Install 2 x 6's between studs firmly
flush with stud front. Make sure all mounting screws will anchor to added
lumber. Replace drywall and refinish.
8. Remark center line and hood bottom on same location as before and tape
template on wall as in step 3 above.
9. Mount 2 mounting hooks with wood screws (supplied in mounting
hardware kit) on locationsmarked on template, then remove template.
10. Install duct cover ceiling bracket to wall flush to ceiling with drywall
anchors supplied. Figure 3.
Figure 2Figure 2
Figure 2Figure 2
Figure 2
C
L
16
16
Figure 3Figure 3
Figure 3Figure 3
Figure 3
Tools required for installationTools required for installation
Tools required for installationTools required for installation
Tools required for installation
Screw driver
(flat head, pozidrive n°2 and torx 10)
Allen spanner 4mm
Electric drill with twist bit Ø 10 mm