GE 229C4053P447-3 1 Range User Manual


 
11
Final Check List
Operation Check List
Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.
Be sure power is in service to the building.
Check to be sure that all packing materials and tape on metal panel (if applicable) under
control knobs have been removed.
Check to make sure the Clock display is energized. If a series of horizontal red lines appear
in the display, disconnect power immediately. Recheck the range wiring connections. If
change is made to connections, retest again. If no change is required, have building wiring
checked for proper connections and voltage. It is recommended that the clock be changed if
the red lines appear.
Push in and turn any one of the four surface knobs to MED setting to observe that the
element glows within 60 seconds. Turn the knob off when glow is detected. If the glow is not
detected within the time limit, recheck the range wiring connections. If change is required,
retest again. If no change is required, have building wiring checked for proper connections
and voltage.
Installation Instructions
E
F