GE PNSF39Z01 Bread Maker User Manual


 
Installation instructions.
Typical Installation Illustration
Fig. 1
Fig. 2
6
Soft water
Hard water to
outside faucets
MAIN WATER PIPE
Hard water
NOTE:
See
Drain Hose
Connections
section.
24V transformer
120-volt outlet
Hard water
Soft water
From softener outlet
To softener inlet
CROSS-OVER
Use if water supply flows from the left.
Include single or 3-valve bypass.
Hard water
Soft water
From softener outlet
To softener inlet
CROSS-OVER
Use if water supply flows from the left.
Include single or 3-valve bypass.
MAIN WATER PIPE
Soft water
Hard water
24V transformer
120-volt outlet
Bypass valve
Hard water to outside faucets
Inlet valve
Outlet valve
3-valve bypass system
For soft water service:
• Open the inlet and outlet
valves
• Close the bypass valve
For bypass hard water:
• Close the inlet and outlet
valves
• Open the bypass valve
Note:
Threads on the installation
adapters are 1male pipe. If 1
pipes are needed, do not use the
copper tubes and nuts included.
Buy 1” pipe thread female
adapter and plumb directly to 1”
threads on installation adapters.
Nut (2)
Copper tube, 3/4(2)
Washer (2)
Bypass Valve
• pull out for service
• push in for bypass
NOTE:
Threads on the
bypass valve are 1” male
pipe. If 1” pipes are
needed, do not use the
copper tubes and nuts
included. Buy 1” pipe
thread female adapter
and plumb directly to 1”
threads.
Brinewell
Nut (2)
Copper tube, 3/4(2)
Washer (2)
Installation adapter (2) (see above)
INLET
Union (2) (not supplied)
INLET
Optional 3-Valve Bypass Installation Illustration
Adapters for this installation are not supplied with the softener.
To order these adapters, call GE Parts 800-626-2000. Ask for part number WS60X10006.