GE ZSC1201SS Oven User Manual


 
5
Installation Preparation
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
30
23-1/2
25-1/4
17-1/2
2Min.
(3
Recommended)
Per Warming
Drawer
Requirement
Construct
Solid Bottom
Min. 3/8
Plywood
Supported
by 2 x 4 or 2 x 2
Runners all
Four Sides
PREPARE THE OPENING
The Advantium 120V can be installed in
combination with other GE/Monogram appliances.
Always follow each product’s Installation
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30 wide single oven cabinet or cut
the opening in a wall to the dimensions shown.
• Allow 2-1/8case trim overlap on the sides,
1-1/16 overlap on the top and 7/8overlap
on the bottom of the opening for all models.
• Oven overlaps will conceal cut edges on all sides
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120V and the other
appliance overlaps.
Construct a solid oven floor of 3/8min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
30
23-1/2
25-1/4
17-1/2
Construct
Base
Min. 3/8
Plywood
Supported
by 2 x 4 or
2 x 2 Runners
all Four Sides