GE ZV421 Ventilation Hood User Manual


 
10
Plan the Location of the Hood and Ductwork
Use a plumb bob to check the location. The
countertop/cooktop below the hood must be centered
with the hood.
The hood should extend beyond the front and rear edge
of the cooking appliance.
The duct in the ceiling must be centered over the
cooktop.
STEP 1 CONSTRUCT CEILING SUPPORT
Installation Instructions
Ceiling
Hood
Ducting
Centerline
42" Hood Side View
Align With
Center of
Cooktop
Cooktop
Countertop
31-3/4"
Front
15-7/8"
Align With
Center of
Cooktop
Ceiling
Hood
Ducting
Centerline
54" Hood Side View
Cooktop
Countertop
36-1/4"
Front
18-1/8"
Top View Ceiling Joists Parallel to Front of Hood
12-3/4 (42 Hood)
17 (54 Hood) Install
Cross-Framing
Symmetrically About
Duct/Cooktop Centerline
16 Joist
Spacing
8 5/8
10 Duct
Front
of
Hood
2x4 Cross
Framing
Cooktop
Outline
Align duct
to center of
Cooktop
Ceiling Support Structure
At the hood location, install 2 x 4 cross framing between
ceiling joists as shown. (2x4s are required to support the
weight of the hood.)
Arrange cross framing in the ceiling to suit the existing
structure.
Your ceiling joists will be like one of the following
examples.
EXAMPLE A