GE ZV900 Ventilation Hood User Manual


 
Installation Instructions
INSTALL DUCT BRACKET
The duct bracket should be installed against the
back wall and flush with the ceiling. This bracket will
hold the duct cover in place at the top.
Secure the bracket to the wall:
Align the marked centerline on the bracket with
the centerline on the wall.
Mark 2 screw hole locations in the wall.
Drill 3/16
pilot holes in the marked locations.
If pilot holes do not enter studs, enlarge the holes
to 3/8
and install wall fastener anchors.
Drive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
Secure the bracket to the wall with wood screws
and/or fasteners.
3
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
• With the template taped in place, use a punch to
mark mounting bracket screw locations.
Drill 3/16
pilot holes in 2 of the punched locations
in the lower bracket.
Remove the template.
Use wood screws to secure the mounting bracket
to the wall. The screws must engage wall studs or
the installed horizontal mounting support.
Check to be sure that the bracket is level.
2
14-5/8
to top of
bracket
C
L
ALIGN BOTTOM EDGE
WITH PENCIL LINE,
INDICATING BOTTOM
OF THE HOOD
Drill 2 (two) 3/16pilot holes through studs or rear wall support
REAR WALL
MOUNTING TEMPLATE
49-80405 04-06 JR
INSTALLATION—VENTED TO THE OUTSIDE
10