GE ZV900 Ventilation Hood User Manual


 
CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING:If house wiring is not 2-wire
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be
sure to use U.L. approved anti-oxidant compound
and aluminum-to-copper connectors.
AVERTISSEMENT :
Si la maison n’est pas câblee avec deux fils et un
fil de terre, l’installateur doit installer un fil de terre.
Quand les fils sont en aluminium, il faut prendre soin
d’utiliser des connecteurs aluminium à cuivre avec
une pâte antioxydante approuvée par U.L.
Remove junction box cover and knockout on the
left side.
Secure the house wiring to the junction box with
a strain relief.
Connect white leads to branch circuit white lead.
Connect black leads to branch circuit black lead.
Connect green/yellow leads to branch circuit
green lead or bare ground lead.
Secure all connections with wire nuts on each
electrical connector.
Push wires into junction box and replace cover.
Be sure wires are not pinched.
Secure J-Box cover with original screw.
8
Installation Instructions
INSTALLATION—RECIRCULATING
18
SIZE AND CUT DUCT PIECE
Hold upper air deflector
with duct connector
against the ceiling.
Measure from the bottom
of the air deflector to the
top of the hood as
shown. Reduce that
dimension by 1
to
facilitate installation.
The duct will cover
and overlap the deflector
and the hood outlets.
Cut the duct piece to size and
slip onto the bottom of the
deflector.
Place the assembled deflector
and duct over the exhaust
outlet.
Hold the assembly against the
duct bracket.
Drive 4 screws into the bottom
of the deflector and into the
bracket.
Use duct tape to seal duct
to the deflector and at the
exhaust outlet.
7
Measure
length
Deflector
Duct
length
Knockout
J-Box
cover
House wiring
J-Box
cover